Lakeview Office Building

Architect
LMN Architects
General Contractor
Sierra Construction
Area
46,000 sqft
Our Role
Supply & Installation of mass timber gravity structure
Location
Kirkland, Washington
Status
In Progress
Completion
2020

Mass Timber Office Building in Washington State

This two-storey building is in a prominent location alongside the East side of Lake Washington in Kirkland.

This will be the most recent large-scale mass timber building constructed in the Seattle area, and it will be using DLT floor and roof panels supported by a Douglas Fir Glulam post and beam frame. The lateral load resisting system for the building is a concrete core which will be complete prior to commencement of the mass timber install.

The use of DLT will reduce the project’s embodied carbon by replacing steel or concrete.

The prefabricated DLT panels will further shorten construction duration with an estimated mass timber installation duration of six weeks or less.

Additional updates to come.