StructureCraft

Search our work and ideas

Search by name, place, material or idea.

Explore a topic

Smithers Airport

Smithers, BC, Canada · Completed 2018

Long wood beam suspended during construction at Smithers Airport

Project facts

Owner
Smithers Airport
General Contractor
Vector Projects Group Construction
Architect
Studio 531
Size
$8.5M
Location
Smithers, BC, Canada
Status
Completed 2018
Our involvement
Engineer-Build

Photography & imagery

Diagrams / renders
Studio 531

DLT, CLT and Glulam timber structure.

The Smithers Airport modernization project was aimed at expanding the terminal building by 6,000 sqft in an effort to create a more efficient and welcoming environment for the approximately 80,000 passengers who pass through the airport annually.

Our role on the project was to supply and install the DLT roof panels as well as the supporting CLT shear walls and Glulam moment frames. This project demonstrated the efficient use of both DLT and CLT in their respective strengths.

Smithers Airport was one of the first projects in North America to be built using Dowel Laminated Timber (DLT), the only all wood mass timber panels. Our crew successfully installed the structure in the cold Smithers winter.

StructureCraft, along with teams from Vector Projects, Studio 531, and Kerkhoff Engineering delivered a new structure that will help Smithers Airport achieve:

  • Greater visitor capacity and flow

  • An inspiring design that utilizes timber, including Dowel Laminated Timber, North America’s first all-wood mass timber panel

  • Enhanced views of the surrounding mountains and forests

In the press