Thompson Rivers University Law School
Architect
                            Diamond Schmitt Architects & Stantec
                        General Contractor
                            Yellowridge Construction
                        Our Service
                            Timber Structural Engineer
Timber Prefabrication & Installation
                        Timber Prefabrication & Installation
Size
                            43,000 sf.
                        Location
                            Kamloops, BC, Canada
                        Status
                        Completed 2012
            
                        This renovation and addition transforms an existing two-storey structure into a prominent four-storey campus building, the top half of which houses the university’s new Law School. Prefabrication of the modular roof panels allowed for simultaneous site construction and roof fabrication. The roof panels were erected over a span of roughly six weeks. The structure’s undulating prefabricated wood roof panels were designed to symbolize the region’s nearby mountain ranges.
Awards
Institutional Wood Design Award - Large
                        	2016 BC Wood Design Awards - BC WoodWorks