View project ↗Bridge District Parcel 5

Project facts
- Client
- Redbrick LMD
- Architect
- Hartshorne Plunkard Architecture
- General contractor
- DAVIS Construction
- Size
- 310,000 sq. ft.
- Program
- 272 apartments and ground-floor retail
- Location
- Washington, D.C., USA
- Status
- In Construction
- Our involvement
- Structural Engineer of Record
Design-Build of Timber Structure
Photography & imagery
- Diagrams / renders
- Hartshorne Plunkard Architecture
Overview
Bridge District Parcel 5 features twelve storeys of mass timber above a concrete ground level and two levels of below-grade parking on Washington, D.C.'s Anacostia waterfront. The timber frame achieves a 2hr FRR and is exposed throughout the apartments.
StructureCraft is structural EOR for the entire building, including the foundations, and is designing and building the timber structure in collaboration with DAVIS Construction.
Twelve timber storeys above the podium
A glulam post-and-beam frame carries cross-laminated timber (CLT) floors.
Foundations
Excavation and below-grade concrete, September 2026.
Gallery
First timber columns, October 2026.