Assembly Studios Bandshell

Project facts
- Client
- Gray Media / Assembly Atlanta
- Architect
- Smith Dalia Architects
- General Contractor
- Bailey Construction
- Size
- 4,000 sf.
- Location
- Doraville, GA, USA
- Status
- Completed
- Our involvement
- Structural Engineer of Record
Timber Design-Builder
Photography & imagery
- Completed photography
- StructureCraft
- Construction photography
- Zach Rolen; FLOR Projects; Micah Moeller
- Diagrams / renders
- StructureCraft
A Chebyshev Gridshell With Elastically Bent Timber Members
This bandshell structure features a Chebyshev gridshell created with elastically bent timber members, anchoring into a doubly curved glulam ring beam. The structure is a keystone of the 120-acre production park in Atlanta for Gray Media / Assembly Studios, serving as a focal point for local performing arts.
The timber lattice was developed through computational form-finding and physical model studies, from tabletop models to a larger shop model used to explore assembly and lifting. Affectionately called “the Pringle”, the structure is the first of its kind in North America.
Model studies: from screen to table
Made in-house using 3D printing and hand assembly, small tabletop models brought the curved perimeter ring and timber lattice onto the conference-room table, where different forms could be considered together.
These were working models. Thin strips were laid out over a printed template and joined as a flat grid, then lifted, bent and attached to the ring. Handling the models gave the team a direct sense of how the lattice takes its shape and how it could be built. A small tabletop model was also loaded with a 0.2 kg weight and its deflection compared with a scaled RFEM model.
Testing the geometry and the lift
A larger model took the study onto the shop floor. The lattice was assembled flat from thin laths fastened at each crossing, then suspended from a lifting rig and brought down toward the perimeter ring. As the laths bend, the crossings rotate and the square cells shear into diamonds, allowing the flat grid to take on the shell’s double curvature.
The physical lifting studies complemented the digital deployment sequence. Together, they helped the team work through the geometry and the practical sequence of assembly before lifting the full-size structure on site.
Fabrication & Assembly
The biggest fabrication challenge lay in the rationalization, layup, and shipping of the iconic doubly curved and faceted glulam "ring beam". Rather than sourcing cost-prohibitive custom material from an outside supplier, we opted (as we often do) to solve the problem ourselves in our 50,000 sqft shop in Abbotsford.
Glulam for the ring beam was sourced in singly curved billet form from Western Forest Products, broken up into shippable 60ft segments. Our master carpenters derived a proprietary method of creating double curvature using plywood jigs, not dissimilar from our approach to the doubly curved CLT for the KF Spiral Stair project.
Once laid up, the custom segments feature an elegant chamfer on the visual surface, created through a mixture of CNC and hand planing techniques.