Architect
Atelier Architects, Meiklejohn Architects
General Contractor
Yellowridge Construction
Area
4,600 sqft
Location
Port Alberni, British Columbia, Canada
Our Services
Design Assist, Fabrication and Installation
Completion
2011

Port Alberni Secondary School

Architect
Atelier Architects, Meiklejohn Architects
General Contractor
Yellowridge Construction
Area
4,600 sqft
Location
Port Alberni, British Columbia, Canada
Our Services
Design Assist, Fabrication and Installation
Completion
2011

Overview

StructureCraft was asked to supply and install the WoodWave to replace the standard steel decking on OWSJs. The end result was a structural-architectural-acoustic panel which carried the Port Alberni snow loads, supplied an appearance-grade ceiling and absorbed the gymnasium noise.

The 5,600 sqft Wood Wave roof deck was erected in one day and consisted of 10 panels 11’ wide X up to 44’ long. Each panel was built up of 7 Vees of 10-1/2” depth x 16” width filled with mineral wool and capped with a 1/2” plywood skin.


Awards

2012 Wood Innovation Award
CWC, BC Wood Design Awards