Architect
Lake Flato
Structural Engineer - Timber
StructureCraft
General Contractor
MYCON
Our Service
Design-Build of Timber Structure
Area
3 buildings - 47,000 sqft
Location
Austin, Texas
Completion
In Progress

Magdalena Hotel

Architect
Lake Flato
Structural Engineer - Timber
StructureCraft
General Contractor
MYCON
Our Service
Design-Build of Timber Structure
Area
3 buildings - 47,000 sqft
Location
Austin, Texas
Completion
In Progress

The First Mass Timber Boutique Hotel in North America

PROGRESS UPDATE: We have started on site for the first of three hotel buildings.

Stay tuned for more updates.

StructureCraft, as design-builder, joined the project team early to be structural engineer for the timber superstructure, working closely with Lake Flato Architects through SD, DD and CD phases leading to Building Permit drawings.

Magdalena Hotel will be the first mass timber boutique hotel in North America. The timber hotels consist of one 4 storey, one 3 storey and one 2 storey building. The primary structure at the interior hotel rooms is DLT panels on light wood frame bearing/shear walls. The Dowel-Lam panels will be exposed at the ceiling, making for a warm and welcoming aesthetic in the rooms. Each building has an exterior exposed walkway structure which will be composed of gapped timber panels on Glulam substructure - the wood will be exposed on both sides (floor and ceiling). There are several other timber scope elements including DLT elevator and stair shafts, hanging balconies, hybrid timber/steel staircases and a stand-alone porte-cochere at the entrance.