StructureCraft

Search our work and ideas

Search by name, place, material or idea.

Explore a topic

Arena Stage at the Mead Center for American Theater

Washington, D.C. USA · Completed 2010

Exterior view of Arena Stage at the Mead Center for American Theater

Project facts

Architect
Revery Architecture (Bing Thom Architects)
General Contractor
Clark Construction
Size
$135M
200,000 sf.
Location
Washington, D.C. USA
Status
Completed 2010
Our involvement
Engineer of Record (Gerald Epp)
Engineer-Build

Photography & imagery

Diagrams / renders
StructureCraft

Overview

In the sea of concrete and granite that people have come to expect from buildings in Washington, D.C., a new structure showcasing wood stands out.

When Arena Stage at the Mead Center for American Theater reopened in 2010, it was the first modern structure to use heavy timber components in the United States' capital. It was also the first project in the U.S. to use an efficient hybrid wood and glass enclosure to envelop two existing structures.

Although the timber-backed glass façade supporting a steel roof was a complex design, the decision to use wood was an easy one. “Like most arts projects, especially non-profits like Arena Stage, budget was very tight," said Michael Heeney, principal and executive director for Bing Thom Architects of Vancouver, BC. “We didn't have money for finishes, so the structure had to be beautiful, and wood made perfect sense. Yet in the end, wood ended up doing triple duty. We used it to hold up the roof; we also used it to hold up the glass. And, it provided the final finish for the space. Wood was very cost effective in all three respects."

This custom timber structure supports a 650-foot-long curved cable-suspended glazed façade. Each of the 18 massive elliptically turned Parallam columns is tipped with a custom shaped 350 lb casting and tilted at 4 degrees from vertical. The 50- to 60-foot-high columns not only support the suspended array of Parallam glazing members, but also a 500-foot-long steel roof structure with a 90-foot cantilever. The relationships on this project were also unique, in that Gerald Epp was Structural Engineer of Record for the entire Arena Stage Theatre project, and also subcontractor (through StructureCraft) for the facade structure.

We didn't have money for finishes, so the structure had to be beautiful, and wood made perfect sense. Yet in the end, wood ended up doing triple duty. We used it to hold up the roof; we also used it to hold up the glass. And, it provided the final finish for the space. Wood was very cost effective in all three respects.
Michael Heeney, Principal and Executive Director for Bing Thom Architects
Architectural rendering of Arena Stage at the Mead Center for American Theater

Awards (6)

2012 Engineering Design Award

WoodWorks Eastern NAWD, USA

2011 Architect Award - Bing Thom - BC Wood Design Awards

CWC

2011 Excellence in Structural Engineering - for New Buildings over $100 Million

NCSEA

2011 Award of Excellence

ACEC-BC

2010 Craftsmanship Award for Structural Steel Framing

Washington Building Congress

2011 Wood Design Award

WoodWorks BC

In the press