Owner
Hines
Architect
HPA / DLR Group
General Contractor
New South Construction
Our Services
Engineer-Build
Size
205,000 sf. (Timber Area)
Location
Atlanta, GA, USA
Status
Completed 2019

T3 Atlanta Office

Owner
Hines
Architect
HPA / DLR Group
General Contractor
New South Construction
Our Services
Engineer-Build
Size
205,000 sf. (Timber Area)
Location
Atlanta, GA, USA
Status
Completed 2019

Mass Timber at Scale.

T3 West Midtown is the second T3 office building ("timber, transit, technology") for the developer Hines. It was a privilege to work with the Hines team as the mass timber structural engineer and builder for the 6-storey timber superstructure for the second time. This building uses DLT panels over a Glulam frame with a steel brace frame lateral system. Team members included HPA / DLR Group, MKA and New South Construction.

The first T3 in Minneapolis was completed in 2016 and helped spark the mass timber “revolution” that is being experienced around North America, and demonstrated that, through efficient design and construction, timber can be used competitively in large scale commercial office spaces.

The gravity system is comprised of DLT (dowel-laminated timber) floor and roof panels over a Glulam post and beam substructure. The lateral system consists of perimeter and internal steel brace frames, which StructureCraft installed in sequence with the timber structure.


Awards

2020 Canadian Wood Council Award
Wood Design & Building Awards