Avon Footbridge Avon, Colorado
| Completion: | 2003 |
|---|---|
| General Contractor: | Traer Creek LLC |
| Architect: | Arthur Erickson / Nick Milkovich Architects |
| Services Supplied: | Structural design-build, shop drawings, shop fabrication, erection |
This pedestrian bridge, consisting of a grid of gapped 2×4s for the floor, walls and roof is a main feature of the Avon Village Park. Constructed of uncoated Ironwood dimensional lumber, the entire 10 foot wide structure was prefabricated in our shop in Delta BC and trucked to the site in one piece. The bridge was erected in an afternoon.